Model NO.: Precision Pipe
Wall Thickness: 0.5mm
Tolerance/Precision: Od-/+0.005mm
Trademark: according to customer′s requirement
Specification: OD0.5-8MM
Origin: China, Ningbo
HS Code: 8108909000
Product Name:Thick wall pipe 
Thick Wall Precision Brass Micro Pipe
Traditionally, the pipe with the ratio larger than 0.5 is called thick wall pipe, the limit ratio of thick wall pipe is 1.2. 

Dimensions
ODΦ0.2~Φ8mm, WT0.015~0.5mm

Thick Wall Precision Brass Micro Pipe

Product Description
(1)Material: brass

(2) Applications of our products
We are interested in micro capillary production which widely used in different fields, like Aviation industry, medical industry, etc. 


(3) Tolerance/Precision (OD+/-0.005mm, WT+/-0.005mm, L+/-0.05mm)

(4) Minimum Order: Comply with customer's demand
(If the quantity is less than our MOQ, we may recommend you the similar dimension in stock. )

(5)Advanced equipment: 
Due to its special farbrication technology and equipment, titanium capillary differs a lot to other metal capillary. Only a few companies can manufacture high precision micro titanium capillary in China. With the help of our professional engineers in our factory, we are in a position to improve our machines so that high quality products are produced according to customers' requirements. 

(6) Manufacture Process
Simply, upon Strict Inspection, qualified product is selected to rinse. After rinsing, product is made through tension test and annealing until it conforms to requirement from time to time. After having the ideal product, it's cut into pieces and rinse. Then it's managed by deburring machine and rinse. After drying, product is inspected by microscope. At last, goods are perfect enough to be packed. 

(7) Advantages of products
Competitive price with good quality. 
Low MOQ
Customized size and spec
Convenient transportation
Short lead time (7-30days according to order qty). 


(8)Delivery: Dependable
(Due to the difficulty of different kind of product, we try our best to provide you with the high quality products ASAP. )

(9)Inspection: Microscope inspection in house or by third party. 
(To assure you of the high quality and our reputation, we have our products checked under the microscope. )

(10)Package: 
Vacuum packed in a plastic bag, plastic bag packed in a plastic box, plastic box packed in a carton, or on requirement (totally water resistent)

(11)Transportation: 
EXPRESS, BY SEA OR BY AIR according to your requirement. 

(12)After Sale Service: 
Reply within 24hours, solution within48 hours. 

Company Show

1. About us
This company is specialized in the manufacture of Titanium, nickel and tantalum material, its core business is: Non-ferrous metal materials, clad metal materials and pressure vessels. 

2. Why Choose
Rich experience: 
We have been engaged in machining for 10 years. Our company had good reputation with customers from American, Europe, North America, and Australia, India etc. We also have a good team for sale and quality control. 

Good service: 
We will respond to you within 24 hours. We manufacture non-standard parts according to your drawings. And we will continue to serve you after sales and will be responsible for the mistakes from us. 

Low price: 

The prices of our production are reasonable! The prices will be much better if your quantity is good. 

Pefect quality: 

We have strict quality control from producing to delivery. Our company had strong technology support, 80% of our colleagues are master or bachelor's degree. We have cultivated a group of managers who are familiar with product quality, good at modern concept of management. 

3. Contact
If you have any question or requirements, please don't hesitate to contact us. 


Service Scope: Steam Turbine spare parts supply; steam turbine installation, inspection & overhaul, technological upgrading, turbine technology training, turbine low oil pressure renovation, turbine rotor shaft bend restoration, lower turbine`s vibration and noise, remove speed governing system abnormal volatility or load swing, solve turbine insufficient output, discontent load or other common/exceptional faults.


  Contract to overhaul and all kinds of turbine`s remould, turbine dynamic balance and so on, for satisfying practical operation requirements.


   Provide technical support and service for operation, inspection, maintenance, accident treatment and so on.


1. Steam Turbine Maintenance/Overhaul Service

 

   Steam turbine normal overhaul, failure treatment; main body components repair, heat exchange tubes of cooler replacement and so on.


2. Technical guidance


   Generating or Industrial driving turbine inspection, overhaul, upgrading and other items technical guidance.


3. Thermodynamic System Optimizing Services


   For operating or planning projects or equipment, according to end users` actual CHP(or heat-work cooling) requirements, make cycle efficiency analysis, provide system optimizing service.


4. Speed Governing System Remould

 

   Upgrade old hydraulic governing system to digital electro-hydraulic governing system, satisfy flexi-ble configuration all kinds of control strategy requirement.


5. Flow Passage Optimization and Modification


Total modification for steam turbine shall increase old turbine`s economic efficiency with advanced technology, service life also shall be extension.


6. Turbine Parameters Remold and Modification


Apply to processing or procedure transformation (or project site change) cause turbine operation parameters` change.


7. Uncontrolled extraction steam reconstruction


Consideration of turbine security and economic, open a hole for extraction steam normally in order to heat supply reformation.


8. Steam Turbine Engineering Service


Provide small & middle size Steam Turbine Generator or industrial steam turbine complete set engineering, project design and project installation service.


9. Vibration Analysis and Rotor Dynamic Balance

24Hours Service for emergency vibration analysis and wide range rotor dynamic balance service at project site or back to factory.


10. Condensing (extraction condensing) type remodel to back pressure type


Condensing (extraction condensing) steam turbine remodel to back pressure steam turbine


11. Steam Turbine Vacuum System Upgrade


Condenser three-dimension design and upgrade, reduce heat-transfer temperature difference, increase steam exhaust vacuum degree, improve turbine economic efficiency. Water cooling remodel to air cooling.


12. Steam Turbine Enlargement Capacity Reconstruction


Reconstruct the turbine`s capacity which are caused by system or equipment changing.


13. Motor Speed Governing Variable-frequency Remould

 

 Variable-frequency drive remould for pump systems of all kinds of industrial and mining enterprises.


14. Domestic Equipment Reconstruction


Domestic equipment reconstruction for imported turbine


15. Circulating Cooling Water System Optimization and Modification


Optimization and modification of operating circulating cooling water system, reduce operation energy consumption rate.


16. Waste Heat Steam Turbine Gland Seal System Upgrade


After upgrade, steam leakage ( effect gear box oil quality) shall be improved by the reason of waste heat parameters are not stable.


17. Spare Parts Marketing


Normal easily damaged parts warehouse, shorten delivery time.

Case 1


   A fertilizer company has 2 sets of steam turbine, model are: CB6-3.43/1.27/0.294 and CB6-3.43/1.17/0.294. Because end user`s power load and steam consumption are changed, the turbines must be reconstructed according to steam parameters, flow change and guarantee high efficiency.


   Remould Parameters: turbine max. inlet steam is 100t/h, when inlet steam is 97t/h and inlet pressure is 3.15MPa(g), its extraction steam is 62t/h extraction pressure is 1.51MPa(g), exhaust pressure is 0.21MPa(g), guarantee output is 5800KW (deviation±5% ).


   Main job of remould and overhaul:


   1. Casing was sent back to manufacture`s factory for rebuilding 2 valve seat hole, expand nozzle block steam passage.


   2. Change nozzle block, take out guide blade carrier.


   3. The original double row governing stage impeller and blade was changed to single row governing stage impeller and blade, add governing stage sheath, parts of rotor sleeve need to be changed and adjusted.


   4. LP stage 3rd diaphragm steam passage inspection optimization.


   5. Casing and rotor dismounting and assembling in factory with comprehensive inspection.


   6. Rotor low speed dynamic balance test.


   7. Governor static test in factory, overspeed test.


   8. Dismount & assembly, overhaul at project site.


   9. Clear incrustation for steam governing valve, nozzle and blade.


   10. Gland seal inspection and replacement, gland sealing clearance adjustment, change the seal block which was severe wear, spring leaf which are damaged should be changed.


   11. Every bearing repair and adjust.


   12. HP & LP governing steam valve grinding, stroke adjustment.


   13. Front bearing pedestal dismounting and inspection, patch oil leaking points.


   14. Inspection and patching steam leaking of HP steam governing valve link rod.


   15. Turbine mainbody troubleshooting.

   After remolding is complete, the 2 turbine sets are running very well.


Case 2

There is a paper mill which has a set of steam turbine: B6-3.43/0.981. Due to processing consumption in workshop and load were changed, the end user request reset new back pressure and achieve the best efficiency within the shortest time.


   Parameters reform to: when rated inlet flow: 55t/h, inlet pressure: 3.43±0.2MPa(a), exhaust pressure: 0.59MPa(a), steam rate guarantee value must be 11.65kg/(kw·h), output power must be 4700KW under rated working condition. The reconstruction project is a turnkey project, from preparing components to dismount heat material, equipment dismounting and installation, till to equipment commissioning successfully.


   For reducing the work amount, keep casing and pipelines still, main jobs are following:


   1. Change front & rear gland seal and diaphragm seal.


   2. Change main shaft assembling (keep mail oil pump and coupling still).


   3. Change HP nozzle block, HP guide blade carrier and original 2 stage diaphragm, add 3 stage diaphragm, 5 stage diaphragm adopts special design for satisfy the requirement.


   4. Change the original 3 stage impeller and add another 3 stage impeller.


   5. Steam governing valve link rod adjust inlet steam, check all butterfly valves matching conditions, improper ones should be changed.


   6. Original rotor`s coupling, MOP shall be mounted in new rotor.


   7. Rotor balance.


   8. Change sylphon of governing system.


   9. Change pressure transducer sleeve, adjust hydraulic servo-motor stroke.


   10. Governor static test in factory.


   11. Clear oil system.


  The reconstructed steam turbine is B4.7-3.43/0.59, end user evaluates steam rate, vibration, exhaust temperature very strictly, but the reconstructed steam turbine is running very well and fully meet the design performance.



Steam Turbine Care

Steam Turbine Care,Steam Turbine Services

Shandong Qingneng Power Co., Ltd. , https://www.steamturbine.be

Posted on